1.1.1 - Contractor - new residential buildings covered by a guarantee plan, Class I | Sheet 1.1.1 [Fr] – PDF (53 KB) | Profile 1.1.1, 1.1.2, 1.2 and 1.3 – PDF (762 KB) |
1.1.2 - Contractor - new residential buildings covered by a guarantee plan, Class II | Sheet 1.1.2 [Fr] – PDF (53 KB) | Profile 1.1.1, 1.1.2, 1.2 and 1.3 – PDF (762 KB) |
1.2 - Contractor - small buildings | Sheet 1.2 [Fr] – PDF (53 KB) | Profile 1.1.1, 1.1.2, 1.2 and 1.3 – PDF (762 KB) |
1.3 - Contractor - all buildings | Sheet 1.3 [Fr] – PDF (53 KB) | Profile 1.1.1, 1.1.2, 1.2 and 1.3 – PDF (762 KB) |
1.4 - Contractor - roads and mains | Sheet 1.4 [Fr] – PDF (217 KB) | Profile 1.4[Fr] – PDF (499 KB) |
1.5 - Contractor - civil engineering structures | Sheet 1.5 [Fr] – PDF (529 KB) | Profile 1.5 [Fr] – PDF (615 KB) |
1.6 - Contractor - underwater civil engineering | Sheet 1.6 [Fr] – PDF (525 KB) | Profile 1.6 [Fr] – PDF (967 KB) |
1.7 - Contractor - telecommunications, transmission, transformation and distribution of electric power | Sheet 1.7 Fr] – PDF (475 KB) | Profile 1.7 [Fr] – PDF (459 KB) |
1.8 - Contractor - petroleum equipment installation | Sheet 1.8 [Fr] – PDF (412 KB) | Profile 1.8 [Fr] – PDF (120 KB) |
1.9 - Contractor - building mechanicals | Sheet 1.9 [Fr] – PDF (61 KB) | Profile 1.9 [Fr] – PDF (106 KB) |
1.10 - Contractor - mechanical lifts | Sheet 1.10 [Fr] – PDF (204 KB) | Profile 1.10 [Fr] – PDF (375 KB) |
2.1 - Contractor - drilled wells | Sheet 2.1 [Fr] – PDF (53 KB) | Profile 2.1 [Fr] – PDF (73 KB) |
2.2 - Contractor - non-drilled water collection structures | Sheet 2.2 [Fr] – PDF (53 KB) | Profile 2.2 [Fr] – PDF (80 KB) |
2.3 - Contractor - underground water pumping systems | Sheet 2.3 [Fr] – PDF (53 KB) | Profile 2.3 [Fr] – PDF (81 KB) |
2.4 - Contractor – private sewerage systems | Sheet 2.4 [Fr] – PDF (543 KB) | Profile 2.4 [Fr] – PDF (105 KB) |
2.6 - Contractor - piles and special foundations | Sheet 2.6 [Fr] – PDF (54 KB) | Profile 2.6 [Fr] – PDF (108 KB) |
2.8 - Contractor - blasting | Sheet 2.8 [Fr] – PDF (54 KB) | Profile 2.8 [Fr] – PDF (85 KB) |
3.1 - Contractor - concrete structures | Sheet 3.1 [Fr] – PDF (56 KB) | Profile 3.1 [Fr] – PDF (98 KB) |
4.1 - Contractor – masonry structures | Sheet 4.1 [Fr] – PDF (57 KB) | Profile 4.1 [Fr] – PDF (95 KB) |
5.1 - Contractor - metallic structures and prefabricated concrete elements | Sheet 5.1 [Fr] – PDF (54 KB) | Profile 5.1 [Fr] – PDF (86 KB) |
6.1 - Contractor - wood structures | Sheet 6.1 [Fr] – PDF (53 KB) | Profile 6.1 [Fr] – PDF (96 KB) |
10. - Contractor - solid fuel local heating systems | Sheet 10. [Fr] – PDF (55 KB) | Profile 10. [Fr] – PDF (85 KB) |
11.1 - Contractor – pressurized industrial or institutional piping | Sheet 11.1 [Fr] – PDF (56 KB) | Profile 11.1 [Fr] – PDF (78 KB) |
13.1 - Contractor – lightning protection | Sheet 13.1 [Fr] – PDF (399 KB) | Profile 13.1 [Fr] – PDF (84 KB) |
13.2 - Contractor – fire alarm systems | Sheet 13.2 [Fr] – PDF (55 KB) | Profile 13.2 [Fr] – PDF (85 KB) |
13.3 - Contractor – fire extinguishing systems | Sheet 13.3 [Fr] – PDF (56 KB) | Profile 13.3 [Fr] – PDF (92 KB) |
13.4 - Contractor – local fire extinguishing systems | Sheet 13.4 [Fr] – PDF (57 KB) | Profile 13.4 [Fr] – PDF (83 KB) |
14.1 - Contractor – passenger and freight elevators | Sheet 14.1 [Fr] – PDF (58 KB) | Profile 14.1 [Fr] – PDF (100 KB) |
14.2 - Contractor – lifts for persons with physical disabilities | Sheet 14.2 [Fr] – PDF (57 KB) | Profile 14.2 [Fr] – PDF (94 KB) |
14.3 - Contractor - others types of elevators | Sheet 14.3 [Fr] – PDF (222 KB) | Not available |
15.1 - Owner-builder - warm air heating systems | Sheet 15.1 [Fr] – PDF (253 KB) | Profile 15.1 [Fr] – PDF (135 KB) |
15.1.1 - Contractor - warm air heating systems for certain work that is not reserved exclusively for master pipe-mechanics | Sheet 15.1.1 [Fr] – PDF (244 KB) | Profile 15.1.1 [Fr] – PDF (136 KB) |
15.2 - Owner-builder - natural gas burners | Sheet 15.2 [Fr] – PDF (242 KB) | Profile 15.2 [Fr] – PDF (82 KB) |
15.2.1 - Contractor - natural gas burners for certain work that is not reserved exclusively for master pipe-mechanics | Sheet 15.2.1 [Fr] – PDF (239 KB) | Profile 15.2.1 [Fr] – PDF (82 KB) |
15.3 - Owner-builder - oil burners | Sheet 15.3 [Fr] – PDF (215 KB) | Profile 15.3 [Fr] – PDF (86 KB) |
15.3.1 - Contractor - oil burners for certain work that is not reserved exclusively for master pipe-mechanics | Sheet 15.3.1 [Fr] – PDF (238 KB) | Profile 15.3.1 [Fr] – PDF (87 KB) |
15.4 - Owner-builder - hot water and steam heating systems | Sheet 15.4 [Fr] – PDF (224 KB) | Profile 15.4 [Fr] – PDF (125 KB) |
15.4.1 - Contractor - hot water and steam heating systems for certain work that is not reserved exclusively for master pipe-mechanics | Sheet 15.4.1 [Fr] – PDF (236 KB) | Profile 15.4.1 [Fr] – PDF (126 KB) |
15.5.1 - Contractor - plumbing for certain work that is not reserved exclusively for master pipe mechanics | Sheet 15.5.1 [Fr] – PDF (214 KB) | Profile 15.5.1 [Fr] – PDF (98 KB) |
15.5 - Owner-builder – plumbing | Sheet 15.5 [Fr] – PDF (212 KB) | Profile 15.5 [Fr] – PDF (97 KB) |
15.6 - Contractor - propane | Sheet 15.6 [Fr] – PDF (487 KB) | Profile 15.6 [Fr] – PDF (952 KB) |
15.7 - Contractor – residential ventilation | Sheet 15.7 [Fr] – PDF (58 KB) | Profile 15.7 – PDF (782 KB) |
15.8 - Contractor - ventilation | Sheet 15.8 [Fr] – PDF (73 KB) | Profile 15.8 – PDF (962 KB) |
15.9 - Contractor - small refrigeration systems | Sheet 15.9 [Fr] – PDF (70 KB) | Profile 15.9 [Fr] – PDF (126 KB) |
15.10 - Contractor - refrigeration | Sheet 15.10 [Fr] – PDF (57 KB) | Profile 15.10 [Fr] – PDF (114 KB) |
16. - Owner-builder – electrical | | Profile 16. [Fr] – PDF (123 KB) |
17.1 - Contractor - instrumentation and control systems | Sheet 17.1 [Fr] – PDF (57 KB) | Profile 17.1 [Fr] – PDF (99 KB) |