Régie du bâtiment du Québec

  • Fr

Searching for a contractor or a licence number: consult the Licence holders' repertory.

Searching for a contractor or a licence number: consult the Licence holders' repertory.

Issuance and amendment of licences
Please note that our processing times are currently longer than usual. As of April 10, 2026, we are processing applications received on the following dates:

  • Priority applications: April 1, 2026
  • Regular applications: February 12, 2026

This content in English is intended for individuals covered by the exceptions to the Charter of the French language and its regulations.

Formation continue obligatoire

The last reference period ended on March 31, 2026. You have 90 days to report your hours.

Report your hours
Licence exemptions

Licence exemptions for certain petroleum equipment

Contractors and owner-builders do not have to hold a licence of subclass 1.8 for the installation of petroleum equipment, in cases prescribed :

  • where the planned construction work involves the installation of an aboveground tank outside the building, if the tank is not connected by piping to an apparatus designed to use, dispense or transfer a petroleum product to another tank, and the tank’s capacity is:
    • less than 2 500 L for a tank that is to contain gasoline, fuel ethanol or aviation fuel,
    • less than 5 000 L for a tank that is to contain diesel fuel, biodiesel fuel or fuel oil;
  • where the planned construction work involves the installation or removal of an aboveground petroleum equipment installation outside a building when the installation was manufactured and a tank was connected by piping, during the manufacturing, to an apparatus designed to use, dispense or transfer a petroleum product, and the tank’s capacity is:
    • less than 2 500 L for a tank that is to contain gasoline, fuel ethanol or aviation fuel,
    • less than 5 000 L for a tank that is to contain diesel fuel, biodiesel fuel or fuel oil;
  • where the planned construction work involves the installation, maintenance, repair or alteration of an apparatus that is part of a petroleum equipment installation.

Note that a natural person may not carry out construction work on an installation intended to use gas, a petroleum equipment installation or an electrical installation unless he holds a contractor’s licence.

Formation continue obligatoire

The last reference period ended on March 31, 2026. You have 90 days to report your hours.

Report your hours

Send us your comments.

For further information or to file a complain or report, visit the Contact the RBQ webpage.