Buildings require of their owners the application of a thorough and consistent program of preventive maintenance. This is particularly true of façades of high buildings which are exposed to adverse weather. This is why the façades of all buildings of 5 storeys and more coming under the Regulation must now be subject to a program of periodic verification and maintenance. It is mandatory that they be maintained so as to be free from any defect which could jeopardize safety or contribute to the development of dangerous conditions.

The Explanatory Guide to Façade Maintenance Requirements [Fr] – PDF (2.8 MB) is an explanatory guide for the owners of the buildings concerned with the aim of facilitating understanding of façade maintenance obligations. In particular, it indicates the information a register and a verification report must contain.

Keeping of a register

For the lifetime of the building, the following information or documents must be consigned in a register, kept on the premises:

  • the contact details of the owner
  • if available, the copy of the as-built drawings of the construction work of the façades, any photography and any other document or information in connection with the alterations performed
  • the description of the repair, alteration or maintenance work performed on the façades, and the description of the repairs done repeatedly in order to rectify a single issue
  • the verification reports of the façades.

Verification by a professional

The owner must obtain from an architect or an engineer a verification report certifying that the façades of the owner’s building do not show signs of any dangerous condition. An examination of each façade of the building must be carried out no earlier than 6 months before the date of production of the verification report, which must contain:

  1. the name, signature and contact details of the professional having carried out the inspection
  2. a description of the mandate, observation methods used and scope of verification
  3. the civic address of the building
  4. the dates of the inspections
  5. the location and description of the defects and their causes, which can contribute to the development of dangerous conditions (infiltrations, rust, efflorescence, scaling, cracks, etc.) as well as all problems with connectors or ties noted on components attached to any one of the façades
  6. the description of the work remedial actions called for as well as the schedule recommended for performing these, if applicable
  7. a summary of the report confirming that the façades of the building do not show signs of any dangerous condition, and if applicable, that recommendations have been issued to the owner in view of rectifying the defects reported
  8. appendices for the photos, drawings and all other relevant data which may complement the report.

Reporting of dangerous conditions

When the presence of a dangerous condition is noted by the professional, he must advise immediately both the owner and the RBQ about it and make recommendations in this regard. As for the owner, he must:

  1. set up the emergency measures to ensure the safety of the public
  2. notify the RBQ immediately. The owner must complete the form entitled Reporting a dangerous condition: façade or parking garage [Fr]
  3. within 30 days, supply by writing to the RBQ a description prepared by an engineer or architect of the remedial action work to be performed, and for the purpose of approval, a schedule for the completion of this work
  4. ensure that the work is carried out in accordance with the aforementioned description, planning and schedule
  5. obtain, at the end of the work, a verification report confirming the safeness of the façades
  6. forward to the RBQ a letter signed by the engineer or architect, confirming that all of the remedial action work called for has been performed and that there no longer exist dangerous conditions.

Frequency of the verification reports

The owner of a building must obtain a verification report at the latest on the day of the 10th anniversary of its construction.

If on March 18, 2013 the building is:

  1. more than 45 years of age, a report must be produced before March 18, 2015
  2. more than 25 but less than 45 years of age, a report must be produced before March 18, 2016
  3. more than 15 but less than 25 years of age, a report must be produced before March 18, 2017
  4. more than 10 but less than 15 years of age, a report must be produced before March 18, 2018.

Thereafter, the owner shall obtain a verification report of the façades every 5 years.

Signs of deterioration

Some signs of the deterioration of façades may be detected by the building owner. Such signs should alert him that a more thorough, in-depth inspection is called for.

Here are a few examples of these:

  • cracks
  • rust stains
  • signs of physical deterioration at balconies
  • signs of a displacement of stone or concrete blocks or bricks
  • problems with integrity of joints on the exterior cladding.

Furthermore, any equipment which is installed on a façade must be securely attached to it.

Send us your comments...

The field preceded by an asterisk ( * ) must be completed.
*The information provided on this page is:

Portail du gouvernement du Québec (ce site est externe au site de la RBQ).This link leaves the Régie du Batiment du Québec's website
© Gouvernement du Québec 2017This link leaves the Régie du Batiment du Québec's website